CONSOLE CONTROLS
0% OUT
100% IN
Power is NOT rod-chased. Rods set shutdown margin only. Load-follow = salt density feedback.
250 MW_e
1× realtime
OPERATOR TRAINING TAPES
MISSION BRIEFING:
Warm solid FLiBe, start pumps, withdraw absorbers to criticality. Let density feedback hold power.
Objective: Melt salt >459°C, withdraw rods, establish critical chain.
PLANT VISUALIZER · TWO-FLUID MSBR
Fuel salt (orange) · Blanket Th loop (cyan) · IHX · Freeze plug · Drain tanks · Turbine
CO-PILOT CRT TERMINAL
🎛️
DR. DESTINY v1.969
FANTASTIC FISSION FUTURE · MSR OPS
Terminal live. MSBR board cold. Heaters first — power follows the heat sink, not a control loop.
CORE TEMP
20 °C
REACTIVITY
-5000 pcm
REACTOR POWER
0.0 MW
BLANKET TEMP
20 °C
BRED U-233
0.00 kg
XENON POISON
0.00 pcm